On Monday May 5th, 2014 the 3D model team met to continue finishing the Atomium model. Before the meeting, the rods and remaining spheres were cut and spray painted. While still continuing our method of operation, holes were created in the spheres and the rods were stuck into them. The picture below is what was accomplished.
|
A few more spheres were added. The Atomium itself is almost completed. |
The actual Atomium structure is almost finished, all that is missing is the middle sphere and the additional diagonal rods. The middle rod will go through the middle sphere; it also connects to the foundation. The picture below is the information needed for the length of the middle rod and the pavilion. The length of the middle rod is about 17.3 inches and the other diagonal rods are about 4 inches.
Our goal for next week is to go shopping again for the rest of the materials needed; such as the foundation and bipods. We also hope to finish the structure itself and start on the foundation of the building.
Objectives:
- working on 3D physical model again
- work on rough draft of final report
Roles:
- Candace Ly: 3D model team, report
- Yiping Peng: 3D model team, report
- Joshua Choi: 3D model team, report
- Daniel Lefebvre: report, sketchup analysis
No comments:
Post a Comment